Table of Contents
Also known as approval drawings, are documents developed by the steel deck supplier, indicating their interpretation of the design documents for the purpose of fabricating and installing metal deck and accessories.
How Do Submittal Drawings Work:
Submital drawings are made up before final construction of the product can begin.
Why Do Submitall Drawings Matter:
Submital drawings are required mainly by the architect and engineer to confirm that the correct products and quantities will be installed on the project.